Serving Zambia's mining & industrial sector since 1990
100+ PROJECT REFERENCES

Industrial project experience across Zambia's major mines.

The project record below is reorganised from F.S. Musonda's existing service records to make its crane, conductor, lifting and electrical experience easier to evaluate.

Konkola Copper Mines (KCM)

OLD TANK HOUSE • UNIT 1 & 2

11kV transformer rectifier repair and crane conductor works

Repair and reconditioning of 11kV rectifier units; development and installation of overhead-crane current collectors and a 400A power conductor system; refurbishment of festoon systems.

COMPRESSOR HOUSE / ENGINEERING SERVICES

Crane power conductor installation and rehabilitation

Installation of 160A three-pole crane conductor rails and rehabilitation of insulated overhead crane power supplies in workshop areas.

KONKOLA / KAFUE

Power cable extension and mine power supply works

References include extension of 185mm² power cable and a 3.3kV power supply line with associated switching panels and equipment.

KCM / Nkana Smelter

CRANE POWER SYSTEMS

410A four-pole copper-head conductor troubleshooting and refurbishment

The source record lists troubleshooting and rectification of a 360-metre conductor system, current collectors and accessories, plus refurbishment of 5-ton crane conductor systems.

Mopani Copper Mines

MUFULIRA

Crane conductor, festoon and control systems

Overhaul and installation references include 250A crane power supply, festoon and control work, 1000A copper-head conductor installations and insulated conductor systems.

NKANA

Mechanical crane repair and commissioning

Mechanical repair, alignment and refurbishment of crane rails and columns, installation and commissioning of an overhead girder crane, and workshop crane work.

Kansanshi Copper Mines

ELECTROWINNING / MATERIAL HANDLING

Power conductor upgrades, festoons and crane repair

References include upgrades from 60A systems to 410A four-pole copper-head systems, festoon installations, control panels, extensions and repair works.

Chambishi Metals

COPPER TANK HOUSE

Conductor system upgrades and repairs

Upgrade of insulated conductor rails to 410A four-pole copper-head hot-rail systems, supply of crane conductor systems and repair of failed conductor rail sections.

LET'S WORK TOGETHER

Need a dependable industrial partner?

Talk to our team about crane power systems, lifting equipment, electrical installations, industrial parts and technical support.

WA